Monday 4 July 2011

Day 19

Cube Lighting is with us every day now, sorting out the lighting with an incredible amount of wiring. Simon has needed to get his feet wet (and cold), as he has been levelling the brick pillars for specially made illuminated stepping stones. As he's used a light material he's had to resort to paint for the edges so they don't show.


Watering has become a two-man job, even with a long lance for watering. All trees and plants in containers need individual attention to ensure water gets to their roots. It takes over an hour to water the garden at this stage.

The first completed planting bed. Thanks to Chris, Mary and Stephen for their patience with me and their hard work. It's lovely to see how the planting is reflected in the oak framed sandblasted stainless steel screen behind the black bamboo.


No comments:

Post a Comment